Non-claims
The current boundaries of the site’s evidence. Download the machine-readable register.
IDs are local to this register. The workbench keeps its own non-claims register with separate numbering, so its NC-07 is a different non-claim from this NC-07.
| ID | Claim not made | Why |
|---|---|---|
NC-01 | Universal substrate independence | No cross-domain preservation has been measured. |
NC-02 | A production Coherence Gate | The browser evaluates synthetic conformance fixtures, not external effects. |
NC-03 | Zeta zeros govern decisions | Spectral work remains a proposed research probe. |
NC-04 | Named collaborators or Buehler validation | Citations to prior art do not establish collaboration or validation. |
NC-05 | Production authority | The source key is fixture-supplied; the later experimental key has only test authority. |
NC-06 | Standing transfers across crosswalks | One synthetic KiB-to-byte adapter measures a numeric invariant and explicit losses. It establishes no cross-domain authority or general functor. |
NC-07 | Independent replay of the source gate decision | Policy, authority history and invariant material are unavailable for the original fixture. |
NC-08 | A working RuVector/Epistemixer tuning loop | The adapter, controller, baseline and ten-iteration experiment have not been implemented. |
NC-09 | HolE link scores prove preservation or authority | Link scoring is only a proposed discovery input; no model or benchmark has been pinned here. |